Trade supply only  ·  Foshan, Guangdong, China  ·  Since 2006Foshan, China · 2006
TRAYLINEFast Food & QSR
Send Drawings
TRAYLINE TL-T2109 fast food table, Hpl top
Fast Food Tables · model TL-T2109

TRAYLINE Modern Square Fast Food Table — HPL Top, Powder-Coated Steel, QSR Dining Areas

Built for QSR dining areas: hpl top over powder-coated steel, 750 mm working height.

ModelTL-T2109
Typefast food table, outdoor tables
TopHPL Top
BasePowder-Coated Steel
StyleModern
Size700 × 700 mm
Height750 mm
MOQ20 pcs
Lead time15-25 days
PackingCarton, top and base boxed separately
OriginFoshan, Guangdong
CustomisationTop finish, base colour, size, logo

Trade enquiries only · EXW Foshan or DDP · replies inside three working days

The top

HPL Top is specified against the load a fast food floor really puts on a table: elbows, school bags, a customer sitting on the edge. The panel sits on a sub-frame rather than straight on the legs, so weight goes down the frame instead of into the middle of the board.

Seams are sealed at the factory. That stops a spill seeping into a core that would then swell and lift the laminate a year later.

The base

Powder-Coated Steel carries a square top at 750 mm. Column bases are welded to a plate that spreads the load, so a table does not walk across a tiled floor when a chair is pushed against it.

Feet are adjustable on the column and fixed on the four-leg versions. Adjustment matters on a refurbished floor, where a 3 mm fall over a two-metre run is normal and a rocking table is the first complaint a manager hears.

On a fast food floor

Orders are placed by the frame size, not by the colour. Once a size is approved, 20 pcs can be split across two or three top finishes for different store tiers, and lead time stays at 15-25 days.

Packing is by carton with corner protectors on the top. Floor protection is fitted on the feet, so a delivery does not scuff a floor that was just finished.

Next step

Send a floor plan, get a seat count and a price

Room size, counter run and the covers you have to turn at peak. The layout comes back with seat counts, tray-width aisles and a written quotation, usually inside three working days.