Trade supply only  ·  Foshan, Guangdong, China  ·  Since 2006Foshan, China · 2006
TRAYLINEFast Food & QSR
Send Drawings
TRAYLINE TL-T2113 fast food table, Solid wood top
Fast Food Tables · model TL-T2113

TRAYLINE Modern Rectangular Fast Food Table — Solid Wood Top, Solid Wood Base, Quick Service Counters for Tray Service

One of the surfaces that survives a fifteen-minute reset — solid wood top on solid wood base, sized for quick service counters.

ModelTL-T2113
Typefast food table, rectangular tables
TopSolid Wood Top
BaseSolid Wood Base
StyleModern
Size1100 × 700 mm
Height750 mm
MOQ20 pcs
Lead time15-25 days
PackingCarton, top and base boxed separately
OriginFoshan, Guangdong
CustomisationTop finish, base colour, size, logo

Trade enquiries only · EXW Foshan or DDP · replies inside three working days

The top

Solid Wood Top, cut square and edged on four sides. The run lines up because the panels are cut from one batch, not because a fitter straightens them on site.

The finish is matte rather than gloss, so fingerprints and cup rings do not read from across the room, and a chlorine wipe does not dull it.

The base

Solid Wood Base at 750 mm. Legs stay inside the top footprint, which is what lets two tables butt up without a gap and lets a bench run along a wall without fouling a leg.

Finish is a two-coat powder, flat rather than gloss, because a flat coat hides the scuffs that appear in the first month and a gloss one shows every one of them.

On a fast food floor

Packing is by carton with the top and the base boxed separately, so a damaged top can be replaced without shipping a whole table. Cartons are labelled against the position they take on the layout drawing.

Minimum order is 20 pcs, lead time 15-25 days. Top colour and base finish can be changed per order without redrawing the frame.

Next step

Send a floor plan, get a seat count and a price

Room size, counter run and the covers you have to turn at peak. The layout comes back with seat counts, tray-width aisles and a written quotation, usually inside three working days.