Trade supply only  ·  Foshan, Guangdong, China  ·  Since 2006Foshan, China · 2006
TRAYLINEFast Food & QSR
Send Drawings
Home/QSR Chairs/TL-C3890
TRAYLINE TL-C3890 counter stool, Brushed stainless steel
QSR Chairs · model TL-C3890

TRAYLINE Modern Counter Stool — Brushed Stainless Steel, Leather Upholstery, High-Volume Outlets

One of the shapes that survives a fifteen-minute reset — counter stool in high-volume outlets, brushed stainless steel frame.

ModelTL-C3890
Typecounter stool, counter height
FrameBrushed Stainless Steel
SeatLeather Upholstery
StyleModern
Seat height610 mm
MOQ10 pcs
Lead time15-25 days
PackingCarton with wooden frame
OriginFoshan, Guangdong
CustomisationColour, upholstery, size, logo

Trade enquiries only · EXW Foshan or DDP · replies inside three working days

What the frame does

Brushed Stainless Steel does two jobs here. It carries the seat without racking when a customer leans back, and it keeps the footprint tight enough that four chairs fit a 1200 by 700 mm top without the backs meeting.

Legs are cut and drilled against a jig, so a replacement leg from a later batch lines up with the original frame. Coating is a two-coat powder finish, flat rather than gloss, because flat hides scuffs.

The seat and the back

The seat is Leather Upholstery over a moulded shell, shaped rather than flat, so weight goes to the frame instead of to the middle of the panel. On a floor that resets every fifteen minutes, that is the difference between a chair that lasts and a chair that gets replaced.

Seat height is set at 610 mm against a 900 to 1,050 mm counter top, which keeps the chair usable across a whole room rather than only along one wall.

On a fast food floor

Minimum order is 10 pcs and lead time is 15-25 days from approval of the sample. Samples ship before the bulk run on any first order, and the sample is what the bulk order is checked against.

Packing is carton with wooden frame. Floor protection is fitted on the feet, so a new delivery does not scuff a floor that was just finished.

Next step

Send a floor plan, get a seat count and a price

Room size, counter run and the covers you have to turn at peak. The layout comes back with seat counts, tray-width aisles and a written quotation, usually inside three working days.