Trade supply only  ·  Foshan, Guangdong, China  ·  Since 2006Foshan, China · 2006
TRAYLINEFast Food & QSR
Send Drawings
Home/QSR Sets/TL-T2048
TRAYLINE TL-T2048 fast food table set, Marble top
QSR Sets · model TL-T2048

TRAYLINE Premium Square Fast Food Table Set — Marble Top, Powder-Coated Steel, Quick Service Counters

One of the surfaces that survives a fifteen-minute reset — marble top on powder-coated steel, sized for quick service counters.

ModelTL-T2048
Typefast food table set, table and chair sets
TopMarble Top
BasePowder-Coated Steel
StylePremium
Size750 × 750 mm
Height750 mm
MOQ20 pcs
Lead time15-25 days
PackingCarton, top and base boxed separately
OriginFoshan, Guangdong
CustomisationTop finish, base colour, size, logo

Trade enquiries only · EXW Foshan or DDP · replies inside three working days

The top

Marble Top, cut square and edged on four sides. The run lines up because the panels are cut from one batch, not because a fitter straightens them on site.

The finish is matte rather than gloss, so fingerprints and cup rings do not read from across the room, and a chlorine wipe does not dull it.

The base

Powder-Coated Steel at 750 mm. Legs stay inside the top footprint, which is what lets two tables butt up without a gap and lets a bench run along a wall without fouling a leg.

Finish is a two-coat powder, flat rather than gloss, because a flat coat hides the scuffs that appear in the first month and a gloss one shows every one of them.

On a fast food floor

Packing is by carton with the top and the base boxed separately, so a damaged top can be replaced without shipping a whole table. Cartons are labelled against the position they take on the layout drawing.

Minimum order is 20 pcs, lead time 15-25 days. Top colour and base finish can be changed per order without redrawing the frame.

Next step

Send a floor plan, get a seat count and a price

Room size, counter run and the covers you have to turn at peak. The layout comes back with seat counts, tray-width aisles and a written quotation, usually inside three working days.