Trade supply only  ·  Foshan, Guangdong, China  ·  Since 2006Foshan, China · 2006
TRAYLINEFast Food & QSR
Send Drawings
Home/QSR Sets/TL-T2128
TRAYLINE TL-T2128 fast food table set, Solid wood top
QSR Sets · model TL-T2128

TRAYLINE Classic Fast Food Table Set — Solid Wood Top, Powder-Coated Steel, Self-Service Dining

One of the surfaces that survives a fifteen-minute reset — solid wood top on powder-coated steel, sized for self-service dining.

ModelTL-T2128
Typefast food table set, table and chair sets
TopSolid Wood Top
BasePowder-Coated Steel
StyleClassic
Size1100 × 700 mm
Height750 mm
MOQ20 pcs
Lead time15-25 days
PackingCarton, top and base boxed separately
OriginFoshan, Guangdong
CustomisationTop finish, base colour, size, logo

Trade enquiries only · EXW Foshan or DDP · replies inside three working days

What ships in the set

One table and its chairs travel as a single line item, drawn against a 750 mm working height so the seats and the top line up without shims on site.

Solid Wood Top over Powder-Coated Steel. Top, base and seats are boxed as one group and labelled against the position they take on the layout drawing, which is what lets a fitter work a floor without reading a plan.

Chairs and table together

Seats are stacked inside the same shipment, so a store takes one delivery and opens the next morning instead of waiting on two suppliers to agree a date.

Replacement covers, glides and a spare top are quoted against the model number rather than a batch photo, so a refit two years later still matches.

On a fast food floor

Minimum order is 20 pcs and lead time is 15-25 days from approval of the sample. First orders ship a sample before the bulk run, and the bulk order is checked against that sample.

Packing is by carton, top and base separately. Spare glides and touch-up paint travel in the first carton, which saves a maintenance call in year one.

Next step

Send a floor plan, get a seat count and a price

Room size, counter run and the covers you have to turn at peak. The layout comes back with seat counts, tray-width aisles and a written quotation, usually inside three working days.